Replacement of the Linoleum Stairwell

Geneva, Chambésy
April 7, 2017

The U.S. Mission in Geneva  intends to change the existing linoleum stairwell in its main building, 11 route de Pregny in Chambésy.

The works are for the supply of rubber floor  (210m2), supply of rubber safety stair edge  (300ml), removal of the existing damaged rubber floor, recycling and repair of the concrete floor and stair.

Interested and qualified contractors who wish to propose their services should contact the Procurement Office at 022 749 4655 or 4651 for additional information and make arrangement for a site-visit.

Vendor’s registration in the System for Award Management (SAM) will be required for this contract.

Interested vendors are encouraged to check the registration process in the SAM official website www.sam.gov.

Closing date for requests: 04/24/2017

(end announcement)

print  Print